CHANGE
OF TAPES
1.0: CHANGE
OF TAPES
1.1 Define the
backup process for remote locations.
1.2 Define the
backup type, Normal
& incremental backup in HP 72 GB DAT Cartridge and HDD.
1.3 Define the Normal backup, Monday to Saturday and incremental backup
for Sunday.
1.4 Define all
the backups are replacing the old Backup except Sunday, Sunday backup is
appending the Saturday backup
1.5 Define the
backup scheduled on HDD backup at 1:15 P.M. and Tape backup at 10.45 PM.
1.6 Define the
process to change the tape on particular Day by identifying the label on the
tape on daily basis.
1.7 Define the
process to change the tape on daily basis, if not backup will be failed.
No comments:
Post a Comment